2398#,JuYing Road,TaiZhou City, ZheJiang Province,China
+86-13906570816
+86-576-82878867
[email protected]
[email protected]
[email protected]
The following items usually mean that water well drilling tools is installed after installation and installed afterward.
(1) The open gas, liquid, and water pipes is sealed accordingly, and the inside of the channel and the joints are kept clean to preventing foreign matter from entering.
(2) When disassembling the fastener, please clamp the clip, affix a label, or put it in a special box.
(3) Separately packaged spirals and spirals are packaged separately to avoid mixing high-strength spirals, other spirals, and spirals.
(4) The software degreasing of the air system, water well drilling tools, clean the plastic packaging by tightening the outside of each pipe, scraping the screws, and keeping the inside of the pipe clean.
(5) Be careful not to damage the machine when disassembling or hanging.
(6) When placed in a remote place or stored for a long time, it is not exposed to rain, moisturizing, anti-fouling, ready for packaging, and ready for packaging and packaging.
(7) All liquids (oil, water) in the equipment are used to dry the discharge.